Clients and Projects |
| |
|
|
|
Performance Surfaces Installed
These Mondo Products:
|
|
ICE SKATING/RECREATION |
|
|
|
Mondo's Super X Running Track Material
|
|
|
Project: Beaver Creek Resort Village outdoor ice
arena. Beaver Creek, Colorado |
| |
Goal:
The village wanted to provide a durable, all weather, all season, slip
resistant walking surface for ice skaters and guests that would match the
upscale ambiance of the resort village. The unique design challenge: Provide an
all weather solution installed over brick pavers to be installed during the
winter
Solution: Performance Surfaces installed approximately
5000' of Mondo's Super X running track material over Mondo's Everlay applied
directly to heated brick pavers around the outdoor ice skating rink. To achieve
results, we used Mondo's Everlay, a fiberglass reinforced flooring
underlayment. The Super X was custom built with an extra-dense wear layer to
accommodate the cutting forces of ice skates while providing the resilience,
appearance and comfort demanded by the resort and their guests.
|
|
|
|
Mondo's Sport Impact Flooring
|
|
|
Project: Boulder Valley Family YMCA. Broomfield,
Colorado |
| |
Goal:
Boulder Valley YMCA wanted to renovate the ice rink floor with a durable, low
cost attractive solution
The business operations challenge: As with most ice rinks, the period closed for
renovation is very short. This rink had an excessively wet problem floor that
could not be dried sufficiently to diagnose the moisture sources without
delaying critical revenue activities.
Solution: Performance Surfaces installed Mondo's 10mm
multi-layered cut-resistant Sport Impact flooring system over Mondo's Everlay
to provide a permanent moisture resistant solution.
|
|
|
|
EDUCATION - COMMERCIAL |
| |
Project: Angevine Middle School
Cafetorium. Broomfield, Colorado |
| |
Goal:
Boulder Valley School District wanted to replace the carpet in this
multi-purpose cafetorium with a durable, cost effective, slip resistant
flooring solution.
Solution:
Performance Surfaces installed 4500' of Mondo's 3mm Commercial Terranova tiles
to create a dramatic, anti-bacterial/anti-microbial cut-resistant floor. This
sustainable rubber tile improves indoor air quality and substantially reduces
maintenance costs for the school.
|
|
|
|
Tulsa Union High School Activities Center
|
|
|
EDUCATION - ATHLETIC |
| |
Project: Union High School
Activity Center. Tulsa, Oklahoma |
| |
Goal:
Provide world class athletic and commercial flooring for this five thousand
seat multi-purpose athletic/community arena. The construction challenge:
Construction of this high visibility stadium was delayed due to the excessive
moisture emissions from the arena substrate.
Solution:
Performance Solutions installed:
-
33,000' of Mondo's Advance triple layer rubber gym floor to create four
contiguous basketball courts that may also be used for a wide range of athletic
and community activities such as trade shows, and conferences. This floor will
be covered by a portable wood basketball floor during competition.
-
The use of Mondo's Everlay, a fiberglass moisture management, stabilizing
underlayment system.
-
Over 30,000' of Mondo Geode; a 2mm resilient commercial flooring along hallways
and common reception/lobby areas.
-
Over 10,000' of Mondo's Speckleflex; a heavy duty weight room material in
weight rooms, cardio areas and locker rooms.
-
A Mondo Maple system Aerobics room for a world class dance studio.
|
|
|
|
Mondo's Triple Layer System
|
|
|
Project: University of Texas - Arlington.
Arlington, Texas |
| |
Goal:
To remodel an existing gymnasium to provide an attractive, state-of-the art
athletic facility. The challenge was the existing gym was covered with an old,
toxic urethane floor. Removing the urethane would have required a hugely
expensive hazardous material disposal project.
Solution:
Performance Surfaces glued Mondo's 10mm Sport Impact over Mondo's Everlay which
was loose laid over the existing poured urethane floor. This technique
encapsulates the toxic urethane surface without bonding to it enabling the
owner to dispose of either the Mondo surface or both at a much later date.
|
|
|
|
2002 Olympics - Sydney, Australia
|
|
|
Project: University of Colorado. Boulder,
Colorado
|
| |
Goal: Provide an elite world class outdoor running
track system to attract athletes and professional level competition to the CU
campus.
Solution:
Performance Surfaces assisted the technical crew of MondoUSA to install a new
eight lane track using Mondo's 12mm Super X material. This is the same material
used on Olympic tracks and venues since 1976 to create the world's fastest
running surfaces.
| "It was great to come out and run here; this feels softer
and faster than the old track. It is an awesome track" |
Casey Burchill
The Daily Camera
Friday May 2, 2003 |
|
| |
|
Project: Huston Huffman Center Recreation
Facility, University of Oklahoma. Norman, Oklahoma
|
University of Oklahoma Huston Huffman Center
|
|
Goal:
To renovate and expand the athletic surfaces in a dynamic state-of-the art
university activity center.
The Solution:
Performance Surfaces installed:
-
10,000' of Mondo's Sport Impact to create a dramatic new weight room
-
8000' of Mondo's Speckleflex to create an easy to clean, attractive cardio and
circuit training center.
-
12,000' of Mondo's 13mm Super X to create a three-lane indoor running track.
|
|
|
|
First Church of the Nazarene
|
|
|
CHURCHES |
| |
Project: First Church of the Nazarene.
Bartlesville, Oklahoma |
| |
Goal:
To expand the community outreach of this congregation by providing a durable
multi-purpose athletic flooring in a new family life center that would appeal
to both senior members and serve as a center for youth activity in the
community.
Solution:
Performance Surfaces installed:
-
Approximately 6000' of Mondo's 10mm Advance multi-purpose gym floor system in
two colors.
-
Approximately 3000' of Mondo's Super X track material to create a circular
walking track for seniors along the outside of the gym floor.
-
Custom built Jaypro ceiling suspended retractable backstops
-
Three Jaypro Volleyball court systems.
|
|
|
|
Project: Cottonwood Creek Baptist Church. Texas |
| |
Goal:
To provide a multi-purpose floor system that enables the church to maintain
superior recreation activities for an emerging youth ministry while serving as
a sanctuary floor.
Challenge:
-
Providing a floor system tough enough to withstand the placement and movement
of tables and chairs as well as an athletic surface durable enough to
accommodate a variety of indoor recreation activities including basketball,
roller hockey, and more.
-
Installing the floor in a rapid-build application where the substrate will not
have sufficient time to cure.
Solution:
Performance Surfaces installed Mondo's 8mm Advance triple-layer gym floor
system over Mondo's Everlay.
|
| |
|
HEALTH CARE |
| |
|
Project: Memorial Hospital of Converse County,
Douglas, Wyoming
|
| |
|
Goal:
This community hospital wanted to enhance the pediatrics wing with a
state-of-the-art birthing center.
Challenge:
The hospital wanted a flooring material that would manage the point loading of
hospital beds and equipment; provide a comfortable, slip-resistant footing for
new mothers and, provide an antiseptic environment.
Solution: Performance Surfaces used Mondo's Terranova,
a 3mm resilient commercial rubber flooring in the new birthing room.
Terranova's unique slate texture provides additional slip resistance to the
already naturally slip resistant flooring.
|