Home About Us Products Clients Contact Us
 
    Clients and Projects
     

Performance Surfaces Installed
These Mondo Products:

  ICE SKATING/RECREATION
Mondo's Super X Running Track Material

Mondo's Super X Running Track Material

  Project: Beaver Creek Resort Village outdoor ice arena. Beaver Creek, Colorado
 

Goal: The village wanted to provide a durable, all weather, all season, slip resistant walking surface for ice skaters and guests that would match the upscale ambiance of the resort village. The unique design challenge: Provide an all weather solution installed over brick pavers to be installed during the winter

Solution: Performance Surfaces installed approximately 5000' of Mondo's Super X running track material over Mondo's Everlay applied directly to heated brick pavers around the outdoor ice skating rink. To achieve results, we used Mondo's Everlay, a fiberglass reinforced flooring underlayment. The Super X was custom built with an extra-dense wear layer to accommodate the cutting forces of ice skates while providing the resilience, appearance and comfort demanded by the resort and their guests.


Mondo's Sport Impact Flooring

Mondo's Sport Impact Flooring

  Project: Boulder Valley Family YMCA. Broomfield, Colorado
 

Goal: Boulder Valley YMCA wanted to renovate the ice rink floor with a durable, low cost attractive solution

The business operations challenge: As with most ice rinks, the period closed for renovation is very short. This rink had an excessively wet problem floor that could not be dried sufficiently to diagnose the moisture sources without delaying critical revenue activities.

Solution: Performance Surfaces installed Mondo's 10mm multi-layered cut-resistant Sport Impact flooring system over Mondo's Everlay to provide a permanent moisture resistant solution.


Angevine Middle School

Angevine Middle School

  EDUCATION - COMMERCIAL
  Project: Angevine Middle School Cafetorium. Broomfield, Colorado
 

Goal: Boulder Valley School District wanted to replace the carpet in this multi-purpose cafetorium with a durable, cost effective, slip resistant flooring solution.

Solution: Performance Surfaces installed 4500' of Mondo's 3mm Commercial Terranova tiles to create a dramatic, anti-bacterial/anti-microbial cut-resistant floor. This sustainable rubber tile improves indoor air quality and substantially reduces maintenance costs for the school.



Tulsa Union High School Activities Center

Tulsa Union High School Activities Center

  EDUCATION - ATHLETIC
  Project: Union High School Activity Center. Tulsa, Oklahoma
 

Goal: Provide world class athletic and commercial flooring for this five thousand seat multi-purpose athletic/community arena. The construction challenge: Construction of this high visibility stadium was delayed due to the excessive moisture emissions from the arena substrate.

Solution: Performance Solutions installed:

  • 33,000' of Mondo's Advance triple layer rubber gym floor to create four contiguous basketball courts that may also be used for a wide range of athletic and community activities such as trade shows, and conferences. This floor will be covered by a portable wood basketball floor during competition.
  • The use of Mondo's Everlay, a fiberglass moisture management, stabilizing underlayment system.
  • Over 30,000' of Mondo Geode; a 2mm resilient commercial flooring along hallways and common reception/lobby areas.
  • Over 10,000' of Mondo's Speckleflex; a heavy duty weight room material in weight rooms, cardio areas and locker rooms.
  • A Mondo Maple system Aerobics room for a world class dance studio.
Mondo's Triple Layer System

Mondo's Triple Layer System

  Project: University of Texas - Arlington. Arlington, Texas
 

Goal: To remodel an existing gymnasium to provide an attractive, state-of-the art athletic facility. The challenge was the existing gym was covered with an old, toxic urethane floor. Removing the urethane would have required a hugely expensive hazardous material disposal project.

Solution: Performance Surfaces glued Mondo's 10mm Sport Impact over Mondo's Everlay which was loose laid over the existing poured urethane floor. This technique encapsulates the toxic urethane surface without bonding to it enabling the owner to dispose of either the Mondo surface or both at a much later date.


2002 Olympics - Sydney, Australia

2002 Olympics - Sydney, Australia

  Project: University of Colorado. Boulder, Colorado
 

Goal: Provide an elite world class outdoor running track system to attract athletes and professional level competition to the CU campus.

Solution: Performance Surfaces assisted the technical crew of MondoUSA to install a new eight lane track using Mondo's 12mm Super X material. This is the same material used on Olympic tracks and venues since 1976 to create the world's fastest running surfaces.

"It was great to come out and run here; this feels softer and faster than the old track. It is an awesome track"
Casey Burchill
The Daily Camera
Friday May 2, 2003

    Project: Huston Huffman Center Recreation Facility, University of Oklahoma. Norman, Oklahoma
University of Oklahoma Huston Huffman Center

University of Oklahoma Huston Huffman Center

 

Goal: To renovate and expand the athletic surfaces in a dynamic state-of-the art university activity center.

The Solution: Performance Surfaces installed:

  • 10,000' of Mondo's Sport Impact to create a dramatic new weight room
  • 8000' of Mondo's Speckleflex to create an easy to clean, attractive cardio and circuit training center.
  • 12,000' of Mondo's 13mm Super X to create a three-lane indoor running track.
First Church of the Nazarene

First Church of the Nazarene



  CHURCHES
  Project: First Church of the Nazarene. Bartlesville, Oklahoma
 

Goal: To expand the community outreach of this congregation by providing a durable multi-purpose athletic flooring in a new family life center that would appeal to both senior members and serve as a center for youth activity in the community.

Solution: Performance Surfaces installed:

  • Approximately 6000' of Mondo's 10mm Advance multi-purpose gym floor system in two colors.
  • Approximately 3000' of Mondo's Super X track material to create a circular walking track for seniors along the outside of the gym floor.
  • Custom built Jaypro ceiling suspended retractable backstops
  • Three Jaypro Volleyball court systems.
    Project: Cottonwood Creek Baptist Church. Texas
 

Goal: To provide a multi-purpose floor system that enables the church to maintain superior recreation activities for an emerging youth ministry while serving as a sanctuary floor.

Challenge:

  • Providing a floor system tough enough to withstand the placement and movement of tables and chairs as well as an athletic surface durable enough to accommodate a variety of indoor recreation activities including basketball, roller hockey, and more.
  • Installing the floor in a rapid-build application where the substrate will not have sufficient time to cure.

Solution: Performance Surfaces installed Mondo's 8mm Advance triple-layer gym floor system over Mondo's Everlay.


    HEALTH CARE
    Project: Memorial Hospital of Converse County, Douglas, Wyoming
   

Goal: This community hospital wanted to enhance the pediatrics wing with a state-of-the-art birthing center.

Challenge: The hospital wanted a flooring material that would manage the point loading of hospital beds and equipment; provide a comfortable, slip-resistant footing for new mothers and, provide an antiseptic environment.

Solution: Performance Surfaces used Mondo's Terranova, a 3mm resilient commercial rubber flooring in the new birthing room. Terranova's unique slate texture provides additional slip resistance to the already naturally slip resistant flooring.

 

Performance Surfaces Home Page